Side View Of Tubular Scaffolding Erected On Building Site With Some Completed Steel Fixing.
The work of steel fixing and formwork required the prior erection of tubular scaffolding before commencement. Some of the completed steel fixing can be seen through the maze of tubular scaffolding. The weather conditions, when the scaffolding shown in the picture below was being erected, was very cold and after a fall of snow, but this did not seem to deter the workmen involved. There was very little warmth in the winter sunshine, struggling to compete with a cold wind.
|

**
**
|